Pole Building

POLE HOUSE

1980-1989

Students: EDES Class Project

Advisor: Randy Detmer

This structure is built on caissons in response to the sloping site. It does not touch the ground. The load from the building transfers into the caissons and into the bedrock. The area in front of this structure has been as a staging area for many projects in the canyon.  Can you find the test footing for the Tensile Structure?

Related Content